One City Square
-
Works in progress, forecasted completion Q1, 2025.
Feasibility study/ analysis for the decarbonisation works at One City Square, Leeds.
Works include detailed surveys and assessments of the existing building services to evaluate their condition and functionality. This will be followed by a capacity assessment to determine the building’s ability to support decarbonisation measures.
The study will also provide concept drawings for the new strategy, highlighting key areas for improvement, along with high-level budget cost estimates.
Additionally, IES building energy modelling assessments will be conducted to evaluate energy usage and potential savings, and electrical loading assessments will be carried out to ensure the building can support the proposed upgrades.