One Finsbury Circus
-
We delivered a smart metering installation, across 5 floors at 1 Finsbury Circus in London as a supplier to CBRE . The three week programme covered the supply and installation of wireless retrofit metering across both electrical and heat meters, alongside a new indoor gateway network to enable remote data capture. We worked alongside our specialist metering team to deliver the installation to a fixed programme, with works largely coordinated in normal working hours with supplementary out of hours periods to minimise disruption to occupiers.
The project focused on giving the client improved visibility over energy consumption at the building, supporting MID compliant tenant level billing without the need for manual meter reads. We managed the full process, from equipment specification through to installation and handover, working to a fixed price and an agreed three week delivery window.
This project reflects the range of services we offer as a supplier to managing agents and FM providers beyond retrofit and refurbishment, helping clients get better data and control over their buildings through targeted, practical upgrades like smart metering.
-
-
Frequently Asked Questions
What does a commercial retrofit contractor do?
A commercial retrofit contractor manages the design, cost, and delivery of upgrading an existing building’s services, things like heating, cooling, hot water, and lighting, to improve energy performance and meet EPC requirements. We act as principal contractor, taking on the cost and delivery risk ourselves rather than working purely in an advisory capacity.
Does Vantage Zero deliver smart metering projects as well as retrofit and refurbishment?
Yes. Alongside our core retrofit and refurbishment work, we deliver targeted upgrades like smart metering, working directly for landlords, managing agents, and FM providers. At 1 Finsbury Circus in London, we supplied and installed wireless retrofit metering across electrical and heat meters for CBRE Global Workplace Solutions, supporting more accurate tenant billing.
What does a smart metering installation involve?
A smart metering installation typically involves retrofitting wireless metering devices onto existing electrical and heat meters, along with an indoor gateway network to capture and transmit consumption data remotely. This removes the need for manual meter reads and gives building managers much better visibility over energy use, which can then support accurate, tenant level billing.
What is MID compliance and why does it matter for heat metering?
MID compliance relates to legal metrology standards for heat meters, and is becoming increasingly relevant under upcoming Heat Network Regulations. Some smart metering upgrades, such as wireless retrofit solutions, allow existing heat meter heads to be retained rather than replaced, which improves data visibility but does not bring the heat meters into full MID compliance. This can be the right choice depending on a client’s priorities at a given stage, though it may mean further investment is needed later if full MID compliance becomes a requirement.