Skip to content

Services

End-to-End Retrofit for Commercial Real Estate

Vantage is a specialist commercial retrofit contractor delivering decarbonisation programmes across office and industrial assets throughout mainland UK. We design, manage and deliver the works ourselves – as Principal Contractor – carrying the delivery and EPC risk so you don’t have to.

Most retrofit programmes fail at the gap between strategy and delivery. Advisory reports with indicative costings leave all the risk with the investor. Vantage closes that gap. Our Clarity feasibility process locks in your target EPC rating, locks in real contractor pricing, and confirms buildability all before capital commitment. All this in as little as eight weeks – then we deliver it.

Solar installations complete in as little as four weeks. Completed solar schemes have delivered NOI uplifts of up to 3.64%, capital value increases of up to £2.1M, and rent increases of up to 46% – all on occupied, live assets with no disruption to tenants.

Discuss your project
commercial retrofit contractor

Our Services

  • We design and deliver rooftop solar PV installations across commercial office and industrial buildings throughout the UK. From feasibility and planning through to installation and grid connection, we manage the full process as a single accountable contractor. Recent schemes have achieved payback periods of four years, NOI uplifts of up to 3.64%, and capital value increases of up to £2.1M - all completed in as little as four weeks on occupied assets with no disruption to tenants.

    Discuss your project
  • We design and deliver full building electrification programmes, removing gas-fired systems and replacing them with high-efficiency alternatives including VRF and centralised heat pumps. Managing structural, mechanical and electrical elements under a single contract removes the coordination risk that typically inflates cost and programme on M&E-led projects. Fully electric buildings eliminate gas price exposure, meet occupier net zero requirements, and directly improve EPC ratings.

    Discuss your project
  • Accurate sub-metering is the foundation of any credible decarbonisation strategy - without it, energy performance is unverifiable. Our installations are completed without building isolations, minimising disruption in occupied buildings. Once live, the data provides full visibility of plant and equipment usage, identifies waste, reduces service charge costs, and generates the verified operational data required for EPC assessments and ESG reporting.

    Discuss your project
  • LED lighting remains one of the highest-returning energy efficiency measures available. Our installations go beyond lamp replacement - we design and install advanced systems with daylight-linked and occupancy-triggered controls that eliminate unnecessary energy use across office floors, common areas and circulation. Properly specified LED systems materially improve EPC ratings at relatively low capital cost, with fast payback periods.

    Discuss your project
  • Occupier demand for EV charging is growing rapidly and is increasingly a factor in lease negotiations. We deliver bespoke EV charging infrastructure from feasibility through to installation, sized correctly for the building's electrical capacity and future-proofed for demand growth. As a Principal Contractor we manage the full scope, no coordination risk between multiple suppliers.

    Discuss your project

We carry the risk, not you As Principal Contractor, we underwrite the delivery and EPC outcome. Your target rating is locked in before works begin – and we are accountable for hitting it.

Clarity before capital Our Clarity™ feasibility process provides investment-grade cost certainty, verified contractor pricing and confirmed buildability before you commit capital. No indicative estimates, no surprises on site.

Delivered on occupied assets Every project we deliver is programmed around live, tenanted buildings. Our clients include institutional landlords and property funds managing occupied multi-asset UK portfolios – minimal disruption is not an aspiration, it is a requirement.

We work with your consultants We operate openly alongside your existing advisors – whether that’s a trusted cost consultant, technical due diligence team or asset manager. Our pricing, methodology and EPC modelling are fully transparent and independently verifiable. Your experts can interrogate everything we do.

 

 


 

Frequently Asked Questions

What is a commercial retrofit contractor? A commercial retrofit contractor designs and delivers energy efficiency and decarbonisation improvements to existing commercial buildings. This includes solar PV installation, fossil fuel removal, LED lighting, metering and high-efficiency mechanical systems. Unlike consultants who produce strategies and reports, a retrofit contractor physically delivers the works on site and is accountable for the outcome.

What does retrofit mean for commercial property? In commercial property, retrofit refers to upgrading an existing building’s energy systems and fabric to improve its EPC rating, reduce carbon emissions and lower operating costs. This can range from single measures such as solar PV or LED lighting through to full building electrification programmes replacing gas-fired systems entirely.

How long does a commercial retrofit project take? This depends on scope. Solar PV installations typically complete in four to five weeks. Full building decarbonisation programmes – including fossil fuel removal, new mechanical systems and fabric improvements – vary by asset complexity. Vantage’s Clarity™ feasibility process establishes a confirmed programme before works begin, so there are no surprises.

What EPC rating will commercial buildings need? The UK government has proposed EPC C as a minimum standard for commercially let properties by 2028, rising to EPC B by 2030. While formal confirmation is still pending, the direction is clear. Vantage’s Clarity™ process models every route to EPC A for your asset – tested, ranked and costed before capital commitment.

Do you work on occupied commercial buildings? Yes. All of our retrofit projects are delivered in occupied, tenanted buildings. We programme works specifically to minimise disruption and manage all health and safety obligations as Principal Contractor.

What areas of the UK do you cover? We deliver commercial retrofit projects across the whole of mainland UK, with offices in London and Manchester. Completed projects include sites in Newcastle, Leeds, Glasgow, Cardiff, Edinburgh, Leicester, Salford and London.

Can you guarantee the EPC rating improvement? Yes. Through our Clarity™ feasibility process we lock in the target EPC rating before works begin, with verified contractor pricing and confirmed buildability. We carry the EPC risk, not the client.

Related News and Insights

11 May 2026

A 25% Energy Reduction. Without Major Works.

At Vantage, we model every viable pathway before capital is committed - from optimisation through to full EPC A delivery.

Arrow right
5 May 2026

Is your Building Heading for a 20% Value Drop?

Sustainability is no longer just compliance - it’s becoming one of the strongest performance drivers in UK real estate.

Arrow right
30 April 2026

Smarter Buildings Start Here

Works are now underway at our site in Finsbury Circus, with site set-up in full swing this week.

Arrow right
28 April 2026

From Dead Space to 15% Rental Premiums

From dead space to 15% rental premiums.

Arrow right
21 April 2026

Project Win – 1 Friary

We’ve been appointed to deliver the reception works at 1 Friary in Bristol - a 60,000 sq ft Grade A office scheme completing this summer.

Arrow right
9 April 2026

Behind the Scenes at Citygate

We’re currently behind the scenes filming new content in our newly refurbished space - and we couldn’t resist sharing a sneak peek!

Arrow right
31 March 2026

Energy Project Secured in Central London

We’re pleased to have been instructed to deliver metering works at prestigious client building in central London. Our scope includes the installation of a replacement metering system, designed to enhance energy visibility and improve overall building performance.

Arrow right
18 March 2026

Optima Transformation Underway

Great to see strong progress on site at our Optima project as works continue to move forward. The team has been making excellent headway, with multiple elements of the refurbishment now taking shape...

Arrow right
11 March 2026

Design Stage Secured for Transformational 68,000sqft Refurbishment

We’re delighted to be appointed to deliver RIBA Stage 3 design for CAT A fit-out works to Block A at Soapworks in Salford, continuing our involvement in the building’s ongoing evolution and growing workspace offer.

Arrow right
9 March 2026

Up to 50% Reduction in Energy Costs.. What Would That Do for Your NOI?

Watch our latest video to learn more about how Vantage can help you reduce your energy consumption. Most investors focus on rent to improve NOI. But a major income leak is often energy performance.

Arrow right
4 March 2026

At MIPIM this year? Let’s catch up

We’re heading to MIPIM next week!

Arrow right
3 March 2026

One Citygate, Newcastle – Project Completion

We’re proud to announce the successful completion of our 25,000 sq ft futureproofing refurbishment at One Citygate in Newcastle upon Tyne.

Arrow right
25 February 2026

Meet our Site Manager – Henry Nwankwo

Meet Henry Nwankwo who is managing our Optima Project in Glasgow.

Arrow right
24 February 2026

Does your building have an EPC rating of C or below?

EPC A space doesn’t just meet compliance — it drives performance. Across live schemes, we’re seeing a 46% rental uplift following EPC-led repositioning.

Arrow right
18 February 2026

Vantage Welcomes Fiona Chatham

We’re delighted to welcome Fiona Chatham to Vantage as our new Business Support and Operations Coordinator.

Arrow right
17 February 2026

Practial Completion Achieved 12 Greek Street

We’re pleased to announce the completion of our multi-floor refurbishment at 12 Greek Street, a landmark workspace in the heart of Leeds’ prime business district.

Arrow right
17 February 2026

Make Every Pound of CapEx Work Harder

Your budget isn’t a constraint — it’s the number that makes the deal work. Too many projects waste months cycling through design and value-engineering that could’ve been avoided. Cost and time drift. Impact gets diluted.

Arrow right
11 February 2026

Vantage Awarded Double Design Appointment at Soapworks

We’re delighted to be appointed to deliver RIBA Stage 4 design works across two suites at Soapworks, continuing our involvement in the building’s evolution and growing workspace portfolio. 

Arrow right
10 February 2026

Vantage Welcomes Adrian Fairless as Contracts Manager

We’re pleased to welcome Adrian, who has joined the team as Contracts Manager. 

Arrow right
10 February 2026

Project Update: Optima Building, Glasgow

Works are progressing well at the Optima Building (58 Robertson Street). Existing timber structures have been cleared to make way for the new Amenity Lounge, with M&E first fix and raised access floor installations now underway across the lounge and CAT A office spaces.

Arrow right
5 February 2026

Project Throwback: Soapworks Solar Installation

Continuing our solar theme this week, we’re spotlighting one of Vantage’s standout 2024 projects at Soapworks - a great example of how the right feasibility insight and delivery team can unlock serious on-site energy potential.

Arrow right
4 February 2026

Sue Smethurst joins the Vantage team

We’re delighted to welcome Sue Smethurst to the Vantage team as Finance Manager, based in our Manchester office.

Arrow right
3 February 2026

Solar…Are you missing the bigger picture?

Solar isn’t just an ESG upgrade, it’s an NOI lever. Too often, solar is judged only on energy savings, whilst its real impact on rents, lease velocity, and capital value is overlooked.

Arrow right
29 January 2026

Mark Priestley promoted to Project Director

We’re pleased to announce the promotion of Mark Priestley to Project Director. Mark has been an integral part of the Vantage team since joining the business in 2024, consistently demonstrating strong leadership, technical expertise, and a commitment to delivering high-quality outcomes for our clients.

Arrow right
office refurbishment
27 January 2026

Vantage Appointed to deliver a new Business Lounge at Optima Building

Vantage has been appointed to deliver a new Business Lounge at Optima Building on behalf of the Landlord. The new amenity will introduce a high-quality breakout environment, providing occupiers with a more comfortable and relaxed space to meet with colleagues and visitors in informal surroundings.

Arrow right
14 October 2025

Vantage Appointed for Multi-Floor Refurbishment at 12 Greek Street, Leeds

Vantage has been appointed to deliver a major multi-floor refurbishment at 12 Greek Street - a landmark workspace in the heart of Leeds’ business district. The project will see three fully fitted Cat A+ suites transformed with a new brand-led design concept, bringing contemporary sophistication to one of the city’s most sought-after office locations.

Arrow right
13 October 2025

The Cheapest Way to EPC A – Explained

Most landlords are being sold retrofit plans based on high-level estimates. The result? Strategies that look good on paper, but collapse once real install costs and supply chain realities kick in. Our latest video breaks down a smarter way forward.....

Arrow right
7 October 2025

We’re Launching a Futureproof Video Series

We're launching a short video series all about our approach to futureproofing commercial real estate. See how Vantage solves the biggest issues facing UK real estate right now - from EPC compliance and decarbonisation, to unlocking value through retrofit.

Arrow right
1 October 2025

The Futureproof Assessment. How Does Your Building Stack Up?

The Futureproof Assessment. A free 2-minute tool that benchmarks your buildings providing a clear, data-driven benchmark of asset performance - highlighting how individual buildings measure up against both current market requirements and evolving occupier demand. 

Arrow right
1 September 2025

Vantage Awarded Major Futureproofing Scheme in Newcastle-Upon-Tyne

We're delighted to announce that Vantage has been awarded a major 25,000sqft futureproofing refurbishment across multiple floors of Newcastle's 'One Citygate' to provide fully electric EPC A spaces, wellness suites and roof level amenity areas.

Arrow right
20 July 2025

Vantage Awarded Fit-Out of Midnight Club’s London HQ

We're delighted to announce that Vantage has been awarded the CAT B refurbishment of The Midnight Club's London HQ. TMC, who are the team behind well-known Adidas Orignals video productions for Leo Messi and Jude Bellingham to name just a few, are taking on additional space in Zetland House, Old Street.

Arrow right
15 May 2025

Practical Completion achieved at Optima, Glasgow

We're delighted to announce practical completion was achieved for our Landlord WC refurbishment at Optima Glasgow yesterday, on behalf of client, Britannia Invest A/S.

Arrow right
6 May 2025

Practical Completion achieved at Morgan Quarter, Cardiff

We’re pleased to announce that practical completion has been achieved on our 39-41 St Mary's Street refurbishment project in Cardiff, delivered on behalf of our client, APAM.

Arrow right
1 May 2025

+91% capital value uplift confirmed for retrofitted properties | Part 3 of Knight Frank series

Knight Frank publish final report in their “Meeting the Commercial Property Retrofit Challenge” series with strong data supporting the business case for retrofit and refurbishment.

Arrow right
28 April 2025

Practical Completion achieved at One City Square, Leeds

We're delighted to announce practical completion was achieved for our Landlord CAT A refurbishment at One City Square yesterday, on behalf of client, Britannia Invest A/S.

Arrow right
13 February 2025

UK average office occupancy hits highest level since lockdown started

CoStar report that recent data from Remit Consulting indicates that UK office occupancy rates have reached their highest levels since the onset of the COVID-19 pandemic. In the week ending January 31, 2025, the average occupancy rate was 37.1%, surpassing the previous peak of 35.9% recorded in March 2024.

Arrow right
12 February 2025

Practical Completion at Arlington Business Park, Reading

We're delighted to announce practical completion for our Solar installation at Arlington Business Park in Reading following a 4 week programme of works on site.

Arrow right
23 January 2025

Works start on our Grade II Listed Building Refurbishment in Cardiff

Works are finally underway our Grade II listed building refurbishment in Cardiff, following successful planning and heritage applications in the later part of 2024. Working directly for landlords GMPF, we are undertaking a shell and core refurbishment in readiness for an incoming F&B tenant, with planned completion end of Q1 2025.

Arrow right
6 January 2025

Second stage of Net Zero Consultancy Services awarded at 1CS

As part of our ongoing sustainability consultancy work with the landlord at 1CS, we have been commissioned to undertake a detailed review of the suitability of a centralised heat pump as potential zero carbon replacement for the in-situ gas fired boilers currently feeding a 4-pipe fan coil system to office floors.

Arrow right
1 January 2025

Rhiannon Flynn joins Vantage as Management Accountant

We are delighted to announce that Rhiannon Flynn joins our growing team from 1st January from sister company APAM. Rhiannon will be based in our Manchester office and responsible for our financial management and accounting going forwards.

Arrow right
19 December 2024

Practical Completion at Mander Shopping Centre

We're delighted to announce the early practical completion for our demise creation works at Mander Shopping Centre, Wolverhampton following a 10 week programme of works on site.

Arrow right
1 November 2024

Vantage awarded major Fit-out in central Leeds

We're delighted to announce we have been awarded a 10,000sqft landlord CAT A refurbishment on the fourth floor of one of Leeds primary business addresses - One City Square.

Arrow right
1 November 2024

Karl Watson joins Vantage as Head of Project Delivery

Karl joins the team with extensive experience in project and construction management and he will provide strategic direction and leadership for our construction division, setting objectives and policies to guide our project delivery and business growth.

Arrow right
28 October 2024

Vantage awarded Sub-metering works at One City Square, Leeds

We are pleased to announce that we have been awarded sub-metering works at One City Square, Leeds. This is a one week project duration where the team will

Arrow right
25 October 2024

Practical Completion at The Arches, Leicester

We are delighted to announce that our PV Installation project at The Arches in Leicester has achieved Practical Completion a week ahead of schedule and exactly on budget - huge thanks to all the project stakeholder group and our on-site delivery team for making this project a success, completing the site installation in just 4 weeks.

Arrow right
25 October 2024

Knight Frank publish latest report in Retrofit Series

Knight Frank provided an in-depth exploration of the commercial property retrofit challenge, with an emphasis on the costs and benefits of improving energy efficiency and sustainability in UK office buildings.

Arrow right
22 October 2024

Vantage awarded Office Refurbishment at Soapworks, Manchester

Vantage are delighted to have been awarded a further project at Soapworks in Salford, working with clients GMPF and our architectural partners at AXI to create a cutting edge 5000sqft plug & play office suite.

Arrow right
27 August 2024

Vantage awarded Shell & Core Works at Morgan Quarter, Cardiff

Arrow right
7 August 2024

Vantage awarded PV installation at The Arches, Leicester

We are delighted to to be awarded PV installation at The Arches, Leicester. This is a 5 week project working directly for the Asset Owners CRIM (Catella).

Arrow right
1 August 2024

Vantage awarded PV Installation at Arlington Business Park

Planning approval received for our new solar scheme at Arlington Park in Reading. We shall be installing a new 190Wp PV system across the three 1400 building on behalf of overall client, Capitaland.

Arrow right
1 July 2024

Sally Butler joins as Project Coordinator

We are thrilled to welcome Sally Butler to the Vantage team as Project Co-ordinator where she will be supporting the Manging Director and the Project Management team.

Arrow right
1 May 2024

Mark Priestley joins as Associate Director

We are thrilled to welcome Mark Priestley to the Vantage team where he joins as Associate Director.

Arrow right
30 April 2024

Vantage awarded Occupier Fit-out at Citygate, Newcastle

We are delighted to be awarded Occupier Fit-out at Citygate, Newcastle.

Arrow right
22 April 2024

Building Analytics Report Commissioned for One City Square, Leeds

Commissioned report will detail current energy intensity baseline, plant and equipment condition reporting, operational energy review, fossil fuel removal strategy, costed asset enhancement strategy and green building certification suitability.

Arrow right
4 April 2024

Vantage awarded 4500sqft Fit-Out Works at Mainpoint, Edinburgh

We were so pleased to work with Innov8 Property Solutions on our recent solar project at Soapworks in Salford. Soapworks now benefits from a 380kWp rooftop solar installation, making use of available flat roof space to provide clean on-site energy generation – and the best bit, it pays for itself in just four years!

Arrow right
21 February 2024

Our Turn-Key Process for Delivering Net Zero Buildings

Vantage is seeking an enthusiastic Project Surveyorto join our team. We are specifically looking for an individual with pre-construction experience, able to efficiently price and tender construction works across M&E and Fit our disciplines throughout the UK...

Arrow right
21 February 2024

Practical Completion
 at Chantry Place

Our PV installation project at Chantry Place Shopping Centre, Norwich achieved practical completion in November. The new 230kWp PV array was delivered on schedule despite the team having to contend with Storm Babet and Storm Ciaran during a busy five week delivery programme...

Arrow right
21 February 2024

Vantage recruiting
 for Project Surveyor

Vantage is seeking an enthusiastic Project Surveyorto join our team. We are specifically looking for an individual with pre-construction experience, able to efficiently price and tender construction works across M&E and Fit our disciplines throughout the UK...

Arrow right
21 February 2024

Client Testimonial for Soapworks PV Projects

We were so pleased to work with Innov8 Property Solutions on our recent solar project at Soapworks in Salford. Soapworks now benefits from a 380kWp rooftop solar installation, making use of available flat roof space to provide clean on-site energy generation – and the best bit, it pays for itself in just four years!

Arrow right
21 February 2024

Vantage Awarded Solar Installation at Mander Centre

Vantage is seeking an enthusiastic Project Surveyorto join our team. We are specifically looking for an individual with pre-construction experience, able to efficiently price and tender construction works across M&E and Fit our disciplines throughout the UK...

Arrow right